Steel structure building
The cost of steel structure warehouses is usually lower than that of concrete buildings. The construction process of prefabricated steel structure buildings is usually less likely to delay the schedule of other buildings. All drilling, cutting, and welding are carried out in the factory, and then the parts are transported to the construction site for installation. Due to the fact that only the parts are assembled on-site, there is almost no additional cost increase.Moreover, the assembly technology requirements for this steel structure prefabricated warehouse are not high. Almost anyone can do it, thereby reducing labor costs and saving time.