Light steel villa turning the tide

July 11, 2024by wpadmin0
432e47c3a7a5c85_w600_h402_副本.jpg

Unlike the traditional cast-in-place construction method, this new construction model is not built brick by brick. There are no randomly stacked cement, bricks, steel bars, and wood on the construction site, nor are there vehicles transporting sand and gravel in and out, and dust everywhere. Instead, the steel columns, beams, diagonal supports and other components of prefabricated buildings are processed and prefabricated in the factory workshop according to the design drawings, and then transported to the construction site for assembly and splicing, in an orderly manner.


Leave a Reply

Your email address will not be published. Required fields are marked *


BALTIMORE

Headquarters

Interactively coordinate proactive “outside the box“ thinking.
+8613522509688

https://www.topjysteel.com/

postmaster@jiayesupplychain.com

LOCATIONS

We Are Everywhere






GET IN TOUCH

Follow Our Activity

Interactively coordinate proactive e-commerce via process-centric “outside the box“ thinking.